Skip to main content

Hello Nintex Community,

Apologize for the question, but my Nintex demand workflows are not starting when a new project is published (this is my first try).  The only action I have in the workflow is to set a project stage.  I have requested the logs from my administrator to look into but I think have spotted an issue.    I attached a screen shot from SharePoint Designer showing that my Nintex Workfows are publishing with the platform type of SharePoint 2010 Workflow.  This does not seem right but I don't get a prompt when I publish a new Nintex demand workflow like I do in SharePoint Designer.  The "IT Project Workflow" is my demand workflow and I think should at least be attributed to Project Server like the designer workflows are.  I have scoured Nintex help articles but do not see anything mentioning a platform type. 

I am not the farm administrator and did not do the initial install.  Is there anything I can ask him to check on the Central Admin side that this needs to be changed?

Thank you. 

I matched my error to this blog by Alex Burton.  I'm sure this step was missed in our installation.  I will find out over the next few days.  It could probably be highlighted a little more as a critical step in the installation guide.  However it is in there, so, we should not have missed it. 

https://epmsource.com/2014/05/24/setting-up-a-workflow-proxy-account-in-project-server-2013/

http://nintexdownload.com/Nsupport/NW4PS2013_Installation_Guide_English.pdf


Reply