I have Sharepoint On Prem 2013 - Nintex Workflow 2013.
I have Site A with List A and Site B with List B, and I need to copy the contents of Site A/ List A to Site B/ List B. There are 61 items to be copied. When configuring Create Item in Another Site, it stops letting me add new items after 50 have be loaded. The 50 actually do copy correctly.
Is there a hard stop after 50 items here?
Any input is greatly appreciated.
