Hello Nintex Community,
Apologize for the question, but my Nintex demand workflows are not starting when a new project is published (this is my first try). The only action I have in the workflow is to set a project stage. I have requested the logs from my administrator to look into but I think have spotted an issue. I attached a screen shot from SharePoint Designer showing that my Nintex Workfows are publishing with the platform type of SharePoint 2010 Workflow. This does not seem right but I don't get a prompt when I publish a new Nintex demand workflow like I do in SharePoint Designer. The "IT Project Workflow" is my demand workflow and I think should at least be attributed to Project Server like the designer workflows are. I have scoured Nintex help articles but do not see anything mentioning a platform type.
I am not the farm administrator and did not do the initial install. Is there anything I can ask him to check on the Central Admin side that this needs to be changed?
Thank you.
Solved! Go to Solution.
I matched my error to this blog by Alex Burton. I'm sure this step was missed in our installation. I will find out over the next few days. It could probably be highlighted a little more as a critical step in the installation guide. However it is in there, so, we should not have missed it.
https://epmsource.com/2014/05/24/setting-up-a-workflow-proxy-account-in-project-server-2013/
http://nintexdownload.com/Nsupport/NW4PS2013_Installation_Guide_English.pdf