Default Line cannot be joined back onto the same activity
I have been able to accomplish this using the Visual Studio designer... are you using the right-click-and-drag method of drawing a line, or does the activity have an outcome line stub already? When I have an outcome line stub, I can left click and drag it back to the same activity successfully as in my blog post here: http://blogs.claritycon.com/blogs/tim_byrne/archive/2007/11/30/3520.aspx
I hope this helps...
tbyrne:I have been able to accomplish this using the Visual Studio designer... are you using the right-click-and-drag method of drawing a line, or does the activity have an outcome line stub already? When I have an outcome line stub, I can left click and drag it back to the same activity successfully as in my blog post here: http://blogs.claritycon.com/blogs/tim_byrne/archive/2007/11/30/3520.aspx
I hope this helps...
i've tried both & neither will let me do, or so it appears :( with the right-click method it doesn't draw a line at all and with the line tool selected it just gives me a new line not joined to anything and even if i then try to join it up onto the same activity it just won't allow it. I've also tried using the outcome line that comes from the default Client Task wizard & that won't work either. I'm using the RTM version are you?
Try to keep in the Shift button when dragging the line.
- Ockert
Ockert:Try to keep in the Shift button when dragging the line.
- Ockert
give that man a cigar :) thanks guys, holding down shift is the answer
Reply
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.