There’s a formula field in my SFDC instance that counts total days an Opp is in a certain implementation stage but only calculates after the Opp is moved out of that certain stage. I’m not allowed to change that field formula since it’s tied to too many reports and have been asked to not create a new field in SFDC and keep it in Skuid, if possible.
I know the UI-only formula to count current days the Opp is in this stage but the problem is an Opp can be moved in and out of this stage more than once and I need to show cumulative days. Is this possible in Skuid? Thanks in advance.