I need to populate a field in a SP (2013) list with the current date and time when the workflow block is triggered. The list column is a Date/Time type, set to capture both date and time. However, whenever the workflow runs, it populates the field with the correct date, but the time is always "12:00". Is there something in the workflow that is causing this, and how can I get the proper date AND time?
Workflow Date / Time Problem
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.
