I need to store a completed InfoPath form (at the end of the process) in a SharePoint library.
According to the Module 08 in K2 Training this can be achieved by using the InfoPath Server Event? But If the form storage is a separate activity that occurs only when the form is approved, it doesn't seem to perform what I want it to, besides, using the Integrate with SharePoint option in the InfoPath Server Event has no way of specifying which library to store the file in?
Looks like Change View event is meant for something along those lines. But if I have an infopath activity which uses one view, and then I want it to switch to a different view without any user involvement using the Change View event in the same activity (or in a different one) but it does NOT change views!
See my response in the following thread:

http://forum.k2workflow.com/viewtopic.php?t=360&highlight=