Skip to main content
Actually i am working with VS2005 so using normal aspx forms and try to code for controlling flow but i am facing problem as in my flow it is defined that when a process level variable named Approval is "Approved" then it must go to next activity "Make Booking" but even after changing that variable my flow is not going anywhere there is no difference so is it so that if i am not using Smart Forms then i have to jump to activities via code plz confirm or i m making some mistake, i am also attaching a document which can give u some idea wt the actual problem m facing.

and if u have any sample code or u have tried something similer then plz Share.
Answered here: http://forum.k2workflow.com/viewtopic.php?p=5556#5556

Please do not spam the forum with multiple posts.

Ockert

Reply