Hi,
What happens to an infopath activity escalation time when the worklist item status is set to sleep. Is the sleep time ignored or added to the escalation time?
Thanks
Page 1 / 1
I haven't tested this but logically, the Escalation should fire irrespective of worklist item status. Remember, the Escalation is set at Activity level and as long as the Activity is still active at the time of Escation, the Escalation will fire. Only if/when the Activity has been completed or expired, will the Escalation be removed/not fired.
Hope this makes sense,
Ockert