Hello,
In my environment, I have eSign/AssureSign connected to SALESFORCE. It works very well and the Nintex AssureSign Envelope is connected to the Quote (In SALESFORCE) and in eSign environment, I have the Envelope and the eSign Document.
I want to allow the cancellation of the already launched eSign process. The Nintex AssureSign Envelope have a status “In Progress”. I imagine that I can create a button to order to change the status of the Nintex AssureSign Envelope (in SALESFORCE). But I want also the inform the eSign Environment (the eSign Document and/or the eSign Envelope).
Do you have any ideas for this Business Process ?