I'm running into a couple of snags when working with a document library that has Check Out required.
1) A simple K2 Designer (sharepoint) process attached to a different list, does not create documents in the document library or update the metadata on them when Check Out is required. I would think the documents could be created. I understand why the metadata would not get applied.. but the process does not error out, all steps indicate successful completion in the view flow.
2) In a more advanced K2 studio process, do I have to do a check out step, then my changes, then a check in step for every modification of the document and it's metadata?
What are best practices here?
Thanks.