cancel
Showing results for 
Search instead for 
Did you mean: 

How to change the date format from a standard UK date format to another format in Nintex Forms

Topic

The default date format for Nintex Forms 2013 is the UK DD/MM/YYYY and for customers located anywhere else like US for example they have a different date format which is MM/DD/YYYY. The demand is the need to change the date format in SharePoint to reflect the local calendar of the user.

Instructions

The function formatDate can be used as follows:
formatDate(date, format) or formateDate({namedControl}, "D")

Note:
  • In the format string, using single or double quotes is required. Using no quotes results in an error.

Related Links


Labels: (2)
Tags (2)
Version history
Revision #:
95 of 95
Last update:
‎03-12-2019 07:10 PM
Updated by: