Can a calculation be too complex for Nintex?
I have two Calculation Value fields one works and shows 0, the other one doesn't and shows #value on the published form.
This's the calculation(each number represents a column except 1 and .75s)
(88-(30*(1+34.5/100)0/2000+1000/2000+.75*5+.75*3))/88