AnsweredAssumed Answered

Date Control Validations

Question asked by santhea on Dec 13, 2015
Latest reply on Dec 14, 2015 by santhea

I'm having trouble setting a validation between two date controls so that the min number of days between the effective from and effective to dates is 3 days and the maximum allowable is 90 days.

Outcomes