AnsweredAssumed Answered

Multiple Reminder Emails/Reminder based on Time

Question asked by wilkies0106aw on Apr 21, 2017
Latest reply on Apr 25, 2017 by wilkies0106aw

Me again.

 

Nintex forms and SharePoint 2013.

 

I've currently setup a basic reminder workflow, which emails an assignee 1 day after a due date has past.  The workflow is at the site level as I've scheduled it.

 

The workflow runs once a day as scheduled.

My end users now want to use the time portion of the date and time control on the form.

 

I've thought about having the workflow scheduled multiple times so the SharePoint list is queried several times a day. i.e. (08,10,12,14,16,18 - hrs or something similar). Sometimes the minutes i.e. 15:30 are important.

 

Is there an easier/alternative way to not miss a due date and time. The due date could be several months in advance, so I don't really want to pause a workflow on a item until X date/time is reached.

 

Thanks

 

Andrew

Outcomes