zharris

Variable Date-Field in Drawloop Word Doc

Discussion created by zharris on Mar 22, 2016
Latest reply on Nov 1, 2017 by eharris04

How do I create a date field in a word document that is calculated based off of an esign signature field, using Drawloop?

 

Basically the functionality needs to be, the day the Subscription Starts will be the day the customer signs via eSign, and then the Subscription End-Date will be calculated using the Subscription Start Date field and then another field(something called Plan Duration), which will be populated with the number of Months the plan will last.

 

Any suggestion on how to approach this?

Outcomes