Hi All
I have an activity with 3 possible routes (lines) to reach it, and 7 lines branching from it. Of the 7, 2 should be followed always and 5 have line rules applied. It was working before with a few less lines, but now the events within the activity fire, but none of the "outbound" lines are being followed. The mgt console shows the process as running but nothing happens.
Is there a limit to the number of lines you can connect to an activity? If so, what is the limit? Ta.