Hello everyone,
We want to enter some exception dates in the Workspace. We have to use the calender because the date-field is protected. When we select a date it's format is yyyy/mm/dd. After pressing the Add-button the date appears in the list of exception dates with this format. When we press the Save-button the error message appears: String was not recognized as a valid date time.
The strange thing about this is that we already entered exception dates a long time ago which have the format dd-mm-yyyy, also entered with the calender. This is the right format because there is no error. How is possible that the calender now gives a different format? We didn't upgrade K2 or something like that.
Kind regards,
Ruud