How to remove the sharepoint 2013 reference from a workflow completely

  • 10 June 2017
  • 1 reply
  • 5 views

Hi,

 

I have designed a workflow with sharepoint 2013 reference since the design was to trigger the workflow when a file is uploaded. Later the design got changed and now there is no need to trigger the workflow when a file is uploaded. Now the problem is that I am not able to remove the sharepoint reference from my workflow. Is there is any way I can remove it? 

 

Regards,

Madhu


1 reply

Badge +15

Hi,


 


If your workflow is designed on K2 Designer, double-click on the Start activity and you should be able to uncheck the conditions you have set to start the workflow.


 


If you are using K2 Studio or Visual Studio, right-click on the Start activity > Properties, look for K2 for SharePoint Process Property Wizard on the left, and you are presented with the same screen that allows you to uncheck the conditions to start your workflow.

Reply