We are in the process of migrating our existing K2.net 2003 application to K2 BlackPearl, in our existing environment we have different K2 processes and each K2 Process has its own String Table. In K2 string tables there two columns one is "Name" and other is "Replace with", in all our process some string table name column values are same but process wise their "replace with" values are different.
---------------
In continuation with the above post, our current environment is K2.net 2003, I am exporting workflow from my old K2 (K2.net 2003) to black pearl using K2 2003 Studio. In our existing environment we have same string table key or name but values are different in different processes.
In the below example I have used the same name i.e “ApplicationPath” but in different workflow it has different values, in Example 1 the value is http://server1 and in Example 2 the value is http://server2
Example 1
String Table
ApplicationPath = http://server1
Process Name= Archive Email
String Table
ApplicationPath = http://server2